'Ain't No Scaffold High Enough!'
- paintyourwaggon
- Mar 25, 2021
- 1 min read
The Scaff is down, leaving the waggon visible once more. The sturdy platform did its job perfectly, becoming my home throughout the lockdown months as the roof was stripped, repaired, sanded, prepped, primed, glossed, canvassed and glossed again and again (7 coats in all). Trims were attached to the sides and new weatherboards fitted front and back, primed and undercoated to complete the work on the roof. It was nice to have a perch for these jobs but what joy to see the waggon without its scaffold overcoat.

Following its last coat of gloss, Atom Scaffold came the very next morning and with polite efficiency removed the various planks and poles to slowly reveal the waggon and the new roof work that had been undertaken over the past months.
Back to the main body now, more repairs to do still before it'll be fully primed, but hopeful that the painting stage is not a million miles away and colours can soon be picked and ordered.
Comments